Service Packages

One of the first steps in developing an architecture is to identify the transportation services that are important to the Region. The following table lists each service package and its applicability to the Region. More information about each service package can be obtained by selecting the service package in the table below.

Service PackageService Package NameStatus
AD1ITS Data MartExisting
ITS Data Mart (Existing)Existing
AD2ITS Data WarehouseExisting
ITS Data Warehouse (Existing)Existing
ITS Data Warehouse (Potential)Planned
APTS01Transit Vehicle TrackingExisting
APTS02Transit Fixed-Route OperationsExisting
APTS03Demand Response Transit OperationsExisting
APTS04Transit Fare Collection ManagementExisting
APTS05Transit SecurityExisting
APTS06Transit Fleet ManagementPlanned
APTS07Multi-modal CoordinationPlanned
APTS08Transit Traveler InformationExisting
APTS09Transit Signal PriorityPlanned
APTS10Transit Passenger CountingPlanned
APTS11Multimodal Connection ProtectionPlanned
ATIS01Broadcast Traveler InformationExisting
ATIS02Interactive Traveler InformationPlanned
Interactive Traveler Information (Existing)Existing
ATIS04Dynamic Route GuidancePlanned
ATIS05ISP Based Trip Planning and Route GuidancePlanned
ISP Based Trip Planning and Route Guidance (Existing)Existing
ATIS06Transportation Operations Data SharingPlanned
ATIS07Travel Services Information and ReservationPlanned
ATIS08Dynamic RidesharingPlanned
ATMS01Network SurveillanceExisting
Network Surveillance (Planned)Planned
Network Surveillance (Potential)Potential
ATMS02Traffic Probe SurveillanceExisting
Probe Surveillance (Planned)Planned
ATMS03Traffic Signal ControlExisting
Surface Street Control (Planned)Existing
Surface Street Control (Potential)Potential
ATMS04Traffic MeteringExisting
ATMS05HOV Lane ManagementPlanned
HOV Lane Management (Potential)Potential
ATMS06Traffic Information DisseminationExisting
Traffic Information Dissemination (Planned)Planned
Traffic Information Dissemination (Potential)Potential
ATMS07Regional Traffic ManagementExisting
Regional Traffic Control (Planned)Planned
ATMS08Traffic Incident Management SystemExisting
Traffic Incident Management System (Planned)Planned
Traffic Incident Management System (Potential)Potential
ATMS09Transportation Decision Support and Demand ManagementExisting
ATMS10Electronic Toll CollectionExisting
ATMS11Emissions Monitoring and ManagementExisting
ATMS12Roadside Lighting System ControlPlanned
ATMS13Standard Railroad Grade CrossingExisting
Standard Railroad Grade Crossing (Planned)Planned
ATMS14Advanced Railroad Grade CrossingExisting
ATMS15Railroad Operations CoordinationPlanned
ATMS16Parking Facility ManagementPlanned
Parking Facility Management (Existing)Existing
ATMS17Regional Parking ManagementPlanned
ATMS18Reversible Lane ManagementExisting
ATMS19Speed Warning and EnforcementExisting
ATMS20Drawbridge ManagementExisting
ATMS21Roadway Closure ManagementPlanned
ATMS22Variable Speed LimitsPlanned
ATMS23Dynamic Lane Management and Shoulder UsePlanned
ATMS24Dynamic Roadway WarningPlanned
ATMS25VMT Road User PaymentPlanned
AVSS05Intersection Safety WarningPlanned
CVO01Carrier Operations and Fleet ManagementPlanned
CVO02Freight AdministrationPlanned
CVO03Electronic ClearanceExisting
CVO04CV Administrative ProcessesExisting
CVO06Weigh-In-MotionExisting
CVO07Roadside CVO SafetyExisting
CVO08On-board CVO SafetyPlanned
CVO09CVO Fleet MaintenanceExisting
CVO10HAZMAT ManagementExisting
CVO12CV Driver Security AuthenticationPlanned
EM01Emergency Call-Taking and DispatchExisting
EM02Emergency RoutingExisting
EM03Mayday and Alarms SupportPlanned
EM04Roadway Service PatrolsExisting
EM05Transportation Infrastructure ProtectionExisting
EM06Wide-Area AlertExisting
EM07Early Warning SystemPlanned
EM08Disaster Response and RecoveryExisting
EM09Evacuation and Reentry ManagementPotential
MC01Maintenance and Construction Vehicle and Equipment TrackingPlanned
MC02Maintenance and Construction Vehicle MaintenanceExisting
MC03Road Weather Data CollectionExisting
Road Weather Data Collection (Potential)Potential
MC04Weather Information Processing and DistributionExisting
Weather Information Processing and Distribution (Planned)Planned
MC06Winter MaintenanceExisting
MC07Roadway Maintenance and ConstructionExisting
Roadway Maintenance and Construction (Planned)Planned
MC08Work Zone ManagementExisting
Work Zone Management (Planned)Planned
MC09Work Zone Safety MonitoringPotential
MC10Maintenance and Construction Activity CoordinationPlanned
MC12Infrastructure MonitoringPlanned